Balloting Result chief minister solarization program click here

For online apply click here

Download Application form click here

Name of the Scheme:Chief Minister’s Program for Solarization of Agriculture Tubewells in Punjab
Total Allocation Cost:Rs.9,887.42million (Rs. 2,500 million for 2024-25)
Gestation Period:2 years (2024-25 to 2025-26)
Scheme objective:Promotion of solar irrigation for agricultural resilience and adaptation to climate changeIncrease water and crop productivityEnhancing farmers’ irrigation affordability
Scheme Components:Solarization of 7,000 Tubewells
Eligibility Criteria for Farmers:Applicant is the resident of Punjab Province (attach a copy of valid CNIC and FRC certificate from NADRA) and one farmer will get one facility/ solar system only from the family. Owner of agricultural land in the revenue boundary of the same district where application is submitted. Attach a copy of valid CNIC and Fard-e-Malakiat as evidence of ownership.Owns an electric tubewell with power requirement upto 15 KW will be considered for solarization. (last paid bill of electric tubewell connection will be submitted as a proof of tubewell ownership, nonpayers/ defaulters will not be considered).The Tubewell Electricity connection should have been installed on or before 31st March, 2024.Tubewell with a watertable depth upto 60 feet is eligible.Should have 3-phase electrical connection.
Category wise Total Cost:Rs.9,887.42million (Govt. Rs. 9,887.42 million)
How to Apply:A massive awareness campaign will be launched for solarization of tubewells. An advertisement will be published in print media for submission of application by the farmers. Application form will be available in the Deputy Director Agriculture (Water Management) office and will submit application in the same office. Afterwards, applications will be scrutinized as per criteria mentioned in the advertisement. Successful farmers will be selected through balloting process against the district quota.
Opening Date:The advertisement will be published on 25.07.2024 and the last date will be 15.08.2024 (Project under approval process)
Submission Date:15.05.2024 (Tentative Dtae)
Department/Wing of Agriculture Department:Water Management Wing of Agriculture Department Punjab
Focal Person Name:Malik Muhammad Akram, Director General Agriculture (Water Management) Punjab Lahore
Contact No.:0300-8814537

Similar Posts